Flood District Outreach Project

Share on Facebook Share on Twitter Share on Linkedin Email this link

March 2023 Update

The Mile High Flood District held a public Information meeting on April 13. Conceptual construction drawings were completed in Spring 2022 for the City Park Drainageway between US 287 and Main Street. A Phase 1 project was identified from the conceptual design to progress to preliminary and final construction plans. Preliminary construction plans are anticipated late Spring 2023 and will continue to final construction plans by late Summer 2023. Additional field data collection was completed prior to the development of the preliminary plans including expanded limits for Survey and Subsurface Utility Engineering (SUE), which is necessary to the design is complete. Geotechnical information was also gathered to analyze the soils in the area to inform structural and pavement designs. Staff will continue to coordinate with the Mile High Flood District (MHFD), internal stakeholders, including Parks & Recreation, Public Works, and Transportation as well as with the Broomfield Town Square development.

The conceptual plans for the Drainageway between US 287 and Main Street cover a large area. To complete the improvements, the project will need to be phased as capital improvement funds are allocated. A Phase 1 project was identified to progress to final design and construction. Phase 1 improvements will extend approximately 300 feet to the East and West of Main Street along City Park Drainageway. Improvements will center around an enlarged concrete box culvert under the roadway for the drainageway and will add a pedestrian crossing under Main Street. The enlarged crossing for the drainageway will allow the 1% annual chance storm event (100-year storm) to be conveyed completely under the roadway and will no longer overtop Main Street. To accommodate the pedestrian undercrossing, the invert of the channel will be lowered by approximately 4 feet, and the roadway will be raised by approximately 1.5 feet in the immediate vicinity of the drainageway. To accommodate the channel lowering, a sculpted concrete drop structure will be added to the drainageway to the west of Main Street. To accommodate the improvements, the existing irrigation culvert for the Harry Brown Ditch will be reconfigured. Multimodal improvements will include the pedestrian undercrossing that will meet ADA criteria and reconstruction of the bike lanes on Main Street. The existing at-grade pedestrian cross walk with a signalized light will be replaced with a High intensity Activated crossWalK (HAWK) pedestrian crossing beacon.

City Park Drainageway is part of a mapped floodplain regulated by the Federal Emergency Management Agency (FEMA). A Conditional Letter of Map Revision (CLOMR) will be developed and submitted to FEMA prior to construction starting on the project. It is anticipated that this CLOMR will be submitted in early Summer 2023. A final Letter of Map Revision (LOMR) will be prepared and submitted to FEMA after Phase 2 is constructed. When approved, this LOMR will result in the remapping of the City Park Channel floodplain and floodway from US 287 to just downstream of Main Street.

March 2023 Update

The Mile High Flood District held a public Information meeting on April 13. Conceptual construction drawings were completed in Spring 2022 for the City Park Drainageway between US 287 and Main Street. A Phase 1 project was identified from the conceptual design to progress to preliminary and final construction plans. Preliminary construction plans are anticipated late Spring 2023 and will continue to final construction plans by late Summer 2023. Additional field data collection was completed prior to the development of the preliminary plans including expanded limits for Survey and Subsurface Utility Engineering (SUE), which is necessary to the design is complete. Geotechnical information was also gathered to analyze the soils in the area to inform structural and pavement designs. Staff will continue to coordinate with the Mile High Flood District (MHFD), internal stakeholders, including Parks & Recreation, Public Works, and Transportation as well as with the Broomfield Town Square development.

The conceptual plans for the Drainageway between US 287 and Main Street cover a large area. To complete the improvements, the project will need to be phased as capital improvement funds are allocated. A Phase 1 project was identified to progress to final design and construction. Phase 1 improvements will extend approximately 300 feet to the East and West of Main Street along City Park Drainageway. Improvements will center around an enlarged concrete box culvert under the roadway for the drainageway and will add a pedestrian crossing under Main Street. The enlarged crossing for the drainageway will allow the 1% annual chance storm event (100-year storm) to be conveyed completely under the roadway and will no longer overtop Main Street. To accommodate the pedestrian undercrossing, the invert of the channel will be lowered by approximately 4 feet, and the roadway will be raised by approximately 1.5 feet in the immediate vicinity of the drainageway. To accommodate the channel lowering, a sculpted concrete drop structure will be added to the drainageway to the west of Main Street. To accommodate the improvements, the existing irrigation culvert for the Harry Brown Ditch will be reconfigured. Multimodal improvements will include the pedestrian undercrossing that will meet ADA criteria and reconstruction of the bike lanes on Main Street. The existing at-grade pedestrian cross walk with a signalized light will be replaced with a High intensity Activated crossWalK (HAWK) pedestrian crossing beacon.

City Park Drainageway is part of a mapped floodplain regulated by the Federal Emergency Management Agency (FEMA). A Conditional Letter of Map Revision (CLOMR) will be developed and submitted to FEMA prior to construction starting on the project. It is anticipated that this CLOMR will be submitted in early Summer 2023. A final Letter of Map Revision (LOMR) will be prepared and submitted to FEMA after Phase 2 is constructed. When approved, this LOMR will result in the remapping of the City Park Channel floodplain and floodway from US 287 to just downstream of Main Street.

  • News & Updates

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Expectations during construction: For work in the parks, portions of the use area will be closed adjacent to the creek. For work on Agate and roadway crossings, detours may be in place. Access to residence homes will be maintained throughout.

  • What Does This Mean?

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Federal Emergency Management Agency (FEMA) - FEMA is Headquartered in Washington, D.C., and has 10 regional offices located across the country. FEMA leverages a tremendous capacity to coordinate within the federal government to make sure America is equipped to prepare for and respond to disasters.

    Flood Insurance Rate Maps (FIRM) - FEMA produces Flood Insurance Rate Maps (FIRM) and Flood Hazard Boundary Maps (FHBM). The FIRM is the most common map used by communities. At a minimum, flood maps show flood risk zones and their boundaries, and may also show floodways and Base Flood Elevations (BFE). More recent flood map products include digital FIRMs (DFIRM). Communities may incorporate DFIRMs into their Geographic Information System (GIS) databases.

    Flood Zone AE Designation - "100-year" regulations/insurance requirements apply. We will provide plans and floodplain workmaps when they finalized and available.

    Floodway - A "Regulatory Floodway" means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

    Special Flood Hazard Area (SFHA) - A SFHA is an area identified by the United States Federal Emergency Management Agency (FEMA) as an area with a special flood or mudflow, and/or flood related erosion hazard, as shown on a flood hazard boundary map or flood insurance rate map.

    Conditional Letter of Map Revision (CLOMR) – A CLOMR is a letter from FEMA's stating a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective BFE or SFHA.

    Letter of Map Revision (LOMR) - A LOMR is the Federal Emergency Management Agency's (FEMA's) official modification to an effective Flood Insurance Rate Map (FIRM). LOMRs can result in a physical change to the existing regulatory floodway, the effective Base Flood Elevations (BFEs), or the Special Flood Hazard Area (SFHA).


Page last updated: 17 Apr 2023, 11:01 AM