Wells Fargo Bank

Share Wells Fargo Bank on Facebook Share Wells Fargo Bank on Twitter Share Wells Fargo Bank on Linkedin Email Wells Fargo Bank link
Site plan showing one commercial building to left (north) and a mixed use parcel to right (south)

This project was received a recommendation for approval from the Land Use Review Commission (LURC) during public hearing on Monday, March 23rd, 2026. This project is subject to the 15-day City Council call-up provision. Councilmembers have until April 8th, 2026 to call this project up for an additional review.

Project Overview

This is a proposal to convert the existing building at 1270 E 1st Avenue into a bank, Wells Fargo, with an ATM drive-through lane around the west side of the site. The required concept review for this development project was waived due to the proposed use being consistent with permitted land uses and overall intent of both the Broomfield Town Centre PUD and the Comprehensive Plan land use map designation. A Use by Special Review shall be required for the proposed drive-thru lane.

Project Details

Applicant: Wallace Design Collective, PC
Location: 1270 E 1st Avenue
Project Type: Site Development Plan/ Urban Renewal Site Plan

City and County Staff Analysis

Zoning, Surrounding Uses and Comprehensive Plan: The zoning for this parcel is PUD. It is located in the Broomfield Town Centre Planned Unit Development (PUD) Plan Area. The proposal is consistent with the Broomfield Comprehensive Plan land use map designation of "Commercial".
Site Circulation, Parking and Multimodal Access: Access to the existing parking lot will be generally unaltered. The ATM drive-through will be a one-way drive that circulates around the west side of the building to the ATM window near the southeast corner of the building. There are 62 existing parking spaces on the site. The submitted SDP proposes reducing parking to accommodate increased landscaping areas and the drive-through lane. The SDP proposes removing 20 spaces, leaving a total of 42 parking spaces.

Landscaping, Open Lands, Parks and Trail Amenities: The new ATM drive-through lane around the west side of the building would effectively eliminate the existing landscape buffer on the west side of the site. Per the submitted landscape plan, new shrubs and trees will be planted along the drive-through lane.

Deviations and Possible Key Issues:

Staff has identified the following key issue for the proposed development:

  • The applicant is requesting a deviation for parking to exceed the maximum number of parking spaces. The deviation request would allow for 42 total parking spaces, instead of the maximum 20 spaces as established by the subject PRA. The applicant is reducing the existing parking by 20 spaces with the redevelopment, resulting in the 42 requested parking spaces.

Process & Next Steps

The Urban Renewal Area Site Plan and Site Development Plan are currently being reviewed by all applicable referral agencies. Site Development Plans are reviewed by the Land Use Review Commission at a public hearing, where the Commission votes to approve (with or without conditions) or deny the request.

The Site Development Plan is limited to approximately 1.01 acres, and since the project area is less than 7 acres in size it is also subject to Land Use Review Commission approval or denial and is subject to the City Council call-up provision in the Broomfield Municipal Code.

Public Engagement Summary

Following the review of the formal application, public hearings were scheduled in accordance with the application review process timeline. Public notices were be sent to property owners within 1,000 feet of this project, sign(s) were posted on the property and a notice was published in the Broomfield Enterprise newspaper.

This project was received a recommendation for approval from the Land Use Review Commission (LURC) during public hearing on Monday, March 23rd, 2026. This project is subject to the 15-day City Council call-up provision. Councilmembers have until April 8th, 2026 to call this project up for an additional review.

Project Overview

This is a proposal to convert the existing building at 1270 E 1st Avenue into a bank, Wells Fargo, with an ATM drive-through lane around the west side of the site. The required concept review for this development project was waived due to the proposed use being consistent with permitted land uses and overall intent of both the Broomfield Town Centre PUD and the Comprehensive Plan land use map designation. A Use by Special Review shall be required for the proposed drive-thru lane.

Project Details

Applicant: Wallace Design Collective, PC
Location: 1270 E 1st Avenue
Project Type: Site Development Plan/ Urban Renewal Site Plan

City and County Staff Analysis

Zoning, Surrounding Uses and Comprehensive Plan: The zoning for this parcel is PUD. It is located in the Broomfield Town Centre Planned Unit Development (PUD) Plan Area. The proposal is consistent with the Broomfield Comprehensive Plan land use map designation of "Commercial".
Site Circulation, Parking and Multimodal Access: Access to the existing parking lot will be generally unaltered. The ATM drive-through will be a one-way drive that circulates around the west side of the building to the ATM window near the southeast corner of the building. There are 62 existing parking spaces on the site. The submitted SDP proposes reducing parking to accommodate increased landscaping areas and the drive-through lane. The SDP proposes removing 20 spaces, leaving a total of 42 parking spaces.

Landscaping, Open Lands, Parks and Trail Amenities: The new ATM drive-through lane around the west side of the building would effectively eliminate the existing landscape buffer on the west side of the site. Per the submitted landscape plan, new shrubs and trees will be planted along the drive-through lane.

Deviations and Possible Key Issues:

Staff has identified the following key issue for the proposed development:

  • The applicant is requesting a deviation for parking to exceed the maximum number of parking spaces. The deviation request would allow for 42 total parking spaces, instead of the maximum 20 spaces as established by the subject PRA. The applicant is reducing the existing parking by 20 spaces with the redevelopment, resulting in the 42 requested parking spaces.

Process & Next Steps

The Urban Renewal Area Site Plan and Site Development Plan are currently being reviewed by all applicable referral agencies. Site Development Plans are reviewed by the Land Use Review Commission at a public hearing, where the Commission votes to approve (with or without conditions) or deny the request.

The Site Development Plan is limited to approximately 1.01 acres, and since the project area is less than 7 acres in size it is also subject to Land Use Review Commission approval or denial and is subject to the City Council call-up provision in the Broomfield Municipal Code.

Public Engagement Summary

Following the review of the formal application, public hearings were scheduled in accordance with the application review process timeline. Public notices were be sent to property owners within 1,000 feet of this project, sign(s) were posted on the property and a notice was published in the Broomfield Enterprise newspaper.

CLOSED: This discussion has concluded.

Submit your questions about the application below. City and County of Broomfield staff will respond to your question within 2-3 business days.

City and County of Broomfield staff are required to be neutral parties in the development application process and can only restate what information the developer has shared in their application. If you would like to share your feedback with City Council please use the “Comments” tab.

Page last updated: 25 Mar 2026, 01:36 PM