Location: Southeast corner of Sheridan Parkway and 167th Avenue

Project Type: Multi-family Residential

Applicant: Davis Development

Project Description: Davis Development is proposing a new 238-unit multifamily apartment community on 8-acres within the North Park/Baseline East Village neighborhood. The plans include a mix of 1-, 2- and 3-bedroom units within four, 4-story apartment buildings. Site characteristics include:

  • an on-site leasing center, fitness center and swimming pool;
  • courtyards with bbq and gathering areas, and a dog run;
  • 422 on-site vehicle parking spaces; 4 motorcycle spaces; 24 bicycle spaces; and 9 dedicated EV charging spaces; and
  • 34% on-site open areas using water conscious landscaping and continuing the use of pollinator plantings to add to the Baseline pollinator district.

Building architecture uses a contrasting color scheme and material selections to provide a modern approach to the overall design. Corner and end features provide 'landmarks' and anchors for the site. All buildings are designed with 'four-sided' architecture using a combination of fiber cement panel siding, brick masonry, and storefront windows and doors.

Perimeter streets and sidewalks (including a 12 foot low stress detached trail along Sheridan Pkwy) were established as part of the East Village site development plan and will be constructed by the master developer.

Inclusionary housing requirements and public land dedication requirements were similarly established as part of the overall East Village neighborhood.

The property is located within the North Park PUD area and is part of the mixed-use Baseline community.

To view plans for this proposal, please find links within the document library.


Consistency with Zoning and Compatibility with Surrounding Uses: The proposal is consistent with the North Park PUD plan. No variances have been requested as part of this development application.

Long Range Financial Plan: The proposal is consistent with land use assumptions in the long range financial plan.

Conceptual Sustainability Elements: The project will incorporate the following sustainability components into the projects design and operation:

  • EV charging for 2% of the surface and garage parking spaces at construction
  • Conduit to accommodate future EV charging stations
  • Energy Star appliances
  • LED lighting
  • Recycling as part of the service provided by waste management company
  • Preservation of natural resources through the use of native, sustainable, pollinator plants


Potential Key Issues for Discussion:

  • At this time, staff have not identified any key issues or major comments for this proposal.

Project Status:

Location: Southeast corner of Sheridan Parkway and 167th Avenue

Project Type: Multi-family Residential

Applicant: Davis Development

Project Description: Davis Development is proposing a new 238-unit multifamily apartment community on 8-acres within the North Park/Baseline East Village neighborhood. The plans include a mix of 1-, 2- and 3-bedroom units within four, 4-story apartment buildings. Site characteristics include:

  • an on-site leasing center, fitness center and swimming pool;
  • courtyards with bbq and gathering areas, and a dog run;
  • 422 on-site vehicle parking spaces; 4 motorcycle spaces; 24 bicycle spaces; and 9 dedicated EV charging spaces; and
  • 34% on-site open areas using water conscious landscaping and continuing the use of pollinator plantings to add to the Baseline pollinator district.

Building architecture uses a contrasting color scheme and material selections to provide a modern approach to the overall design. Corner and end features provide 'landmarks' and anchors for the site. All buildings are designed with 'four-sided' architecture using a combination of fiber cement panel siding, brick masonry, and storefront windows and doors.

Perimeter streets and sidewalks (including a 12 foot low stress detached trail along Sheridan Pkwy) were established as part of the East Village site development plan and will be constructed by the master developer.

Inclusionary housing requirements and public land dedication requirements were similarly established as part of the overall East Village neighborhood.

The property is located within the North Park PUD area and is part of the mixed-use Baseline community.

To view plans for this proposal, please find links within the document library.


Consistency with Zoning and Compatibility with Surrounding Uses: The proposal is consistent with the North Park PUD plan. No variances have been requested as part of this development application.

Long Range Financial Plan: The proposal is consistent with land use assumptions in the long range financial plan.

Conceptual Sustainability Elements: The project will incorporate the following sustainability components into the projects design and operation:

  • EV charging for 2% of the surface and garage parking spaces at construction
  • Conduit to accommodate future EV charging stations
  • Energy Star appliances
  • LED lighting
  • Recycling as part of the service provided by waste management company
  • Preservation of natural resources through the use of native, sustainable, pollinator plants


Potential Key Issues for Discussion:

  • At this time, staff have not identified any key issues or major comments for this proposal.

Project Status:

Discussions: All (1) Open (0)
  • Public Comment (Formal Development Application)

    over 2 years ago
    Share on Facebook Share on Twitter Share on Linkedin Email this link
    CLOSED: This discussion has concluded.

    You need to be signed in to add your comment.

    Thank you for your interest in this development application that has been submitted to the City and County of Broomfield.

    You can submit public comment for this project by clicking the link below.