Skip to content
Banner image of 120th Ave Multimodal Study with photo of intersection

Draft Alternative Design Survey

CDOT and Broomfield are conducting a multimodal study for the US287/120th Avenue corridor. The project team needs your input to help identify the best design concepts for areas along the US 287/120th Avenue Corridor.  

Beginning in the fall of 2022 and continuing through March 2023, the project team has been developing alternative improvements for locations throughout the corridor.  These design concepts were arrived at using public input collected through the summer and fall of 2022 about locations on the corridor that needed improvements.  In addition, existing conditions data outlining travel delay, safety issues, and other information contributed to the development of alternatives.  This effort resulted in concept designs ranging from minor, low-cost changes, to a complete reimagining of how certain areas of the corridor look and operate.

   The project team invites you to provide feedback on several alternatives that envision the most transformational changes in this survey.